How decisions reach the construction site

Housing, costs, climate and collective use: four themes showing how planning influences construction and the quality of the city.

Editorial Note

This edition brings together four themes linked by a practical question: what needs to be decided before and during construction to ensure that the result works.

We begin with the preparation of land intended for housing, a stage at which access, utilities and public space determine when construction can begin. We then examine additional costs in public works and the importance of improving studies, designs and contract preparation.

The third article addresses trees and shade as essential elements in making cities more comfortable and better prepared for heat. Finally, we look at two buildings that integrated environmental performance, support services and collective spaces from the outset of the design process.

The four themes show that construction quality does not depend solely on execution on site. It also depends on preparation, coordination between organisations and how each decision responds to the needs of those who will use the spaces.

MATTERS / Ama Grupo Imobiliário®

In this issue

  1. 01ArticlePreparing land for housing construction
  2. 02ArticleWhy public works costs increase
  3. 03ArticleTrees and shade for more liveable cities
  4. 04ArticleBuildings designed for those who use them
Imagem editorial para Como as decisões chegam à obra
© MATTERS / Fotocomposição

01 · Article

Preparing land for housing construction

Increasing the housing supply requires more than making land available. Infrastructure, coordination between organisations and sufficiently mature projects must be secured before work can proceed.

The Government is negotiating a credit facility with the European Investment Bank to finance municipal land-servicing works for housing. The measure addresses a familiar problem in the sector: the availability of land does not mean that it is ready for construction.

Before work on a building can begin, access, water supply, sewerage, drainage, energy, telecommunications and public space must be provided or upgraded. Land registry information, planning instruments, existing easements and the capacity of the various utility networks must also be reconciled. This work is less visible than building the homes, but it directly affects the timescale, costs and final quality of the neighbourhood.

Funding can help municipalities overcome this stage, particularly where well-located public land and projects with the necessary conditions to proceed are available. However, access to credit does not, in itself, resolve implementation problems. Local demand, proximity to transport and facilities, the capacity of existing infrastructure and the housing types suited to each area must all be assessed.

Coordination is equally critical. Municipalities are responsible for land and public space, but depend on utility operators, environmental bodies, central government, designers and contractors. If each party works to a different timetable, construction may be brought to a standstill despite the availability of funding. Each operation must therefore clearly define what will be delivered, by whom, in what sequence and within what timeframe.

The announcement of new European resources for construction and refurbishment shows that capital is available. The true outcome will be measured by the ability to turn that investment into fully serviced land and then into completed housing. To achieve this, projects must be ready, costs must be controlled and responsibilities must be defined from the outset.

Housing policy begins before the building. It begins with preparing the area and ensuring the quality of the infrastructure that will serve the homes for decades. Giving visibility to this stage makes it possible to assess public measures by what they deliver, rather than solely by the amounts announced.

02 · Article

Why public works costs increase

Not all deviations can be avoided, but many additional costs arise from insufficient information, poorly coordinated designs or decisions deferred until the construction stage.

Additional works under public works contracts amounted to €204.4 million in 2025, the highest annual figure recorded by the Court of Auditors since 2006. Between 2023 and 2025, the accumulated net deviation reached €561.6 million. These figures warrant an analysis that goes beyond scrutiny of final expenditure.

Not all additional works result from failures. A project may encounter geological conditions that differ from those anticipated, buried utilities without reliable records or new technical requirements. Legitimate changes to the brief may also occur. The problem arises when these situations cease to be exceptional and begin to compensate for inadequate surveys, incomplete designs or a lack of coordination between disciplines.

When this happens, the additional cost emerges during construction, but its origin may predate it. A poorly defined brief, insufficient ground investigations, incomplete measurements or incompatibilities between designs transfer decisions to the construction site, where any change tends to be more expensive and to affect the schedule. Supervision is essential, but it cannot fully recover decisions that should have been made before the tender.

The update to the Public Contracts Code and the preparation of a Construction Code may help clarify procedures and responsibilities. However, no legislative change can replace a complete detailed design, reliable baseline information and teams capable of managing complex contracts. Simplifying procedures should not mean postponing checks until the construction stage.

Control must begin during preparation of the contract. The contracting authority needs to confirm the brief, budget, licences, availability of the land, existing constraints and the maturity of the design documents. During construction, changes must be recorded together with their technical justification, the decision made, their financial impact and their effect on the schedule.

It is also important to make use of accumulated experience. When the same problems recur in different contracts, that information should feed back into specifications, design standards and internal procedures. The aim is not to eliminate all changes, which would be unrealistic. It is to reduce late decisions and distinguish a genuine unforeseen event from something that could have been studied and coordinated in advance.

Sources

  • IMPIC
  • Vida Imobiliária
Imagem editorial para Como as decisões chegam à obra
© MATTERS / Fotocomposição

03 · Article

Trees and shade for more liveable cities

The PRO NAT.URBE programme places urban vegetation within a national strategy extending to 2035. The challenge will be to secure the space, water and maintenance required for trees to grow and deliver tangible benefits.

The PRO NAT.URBE programme establishes a strategy to restore green spaces and increase urban tree canopy between 2026 and 2035. Implementation will be the responsibility of municipalities and will be monitored using georeferenced information from the Direção Geral do Território. This approach makes it possible to treat urban vegetation as part of how cities function, rather than merely as a series of isolated interventions.

Planting trees does not, in itself, guarantee shade or comfort. Each tree needs an adequate volume of soil, access to water, room for its roots to develop and protection during construction work. It also needs maintenance after planting. When placed in a tree pit that is too small, above incompatible utilities or in a location without suitable irrigation, it may survive only briefly and never achieve the expected performance.

The choice of locations should respond to the specific needs of each area. Temperature maps, the extent of impermeable surfaces, pedestrian routes, the location of facilities and the age of the population help identify where shade can provide the greatest benefit. Measuring only the number of trees or the average percentage of tree canopy can conceal significant differences between neighbourhoods.

The Portuguese practice OODA's design for a social housing block in Prague shows how these matters can be integrated. The proposal combines municipal housing, retail and a landscaped square, increasing the courtyard's permeable surface. The value of the example lies in the relationship between permeable ground, collective space and urban form, rather than in directly replicating the solution.

In Portugal, this coordination will be particularly important in land development and regeneration schemes. Space for trees should be planned at the same time as pavements, lighting, façades and underground utilities. If vegetation is introduced only at the end, conflicts with other infrastructure restrict growth and increase maintenance costs.

This perspective also changes the approach to budgeting. Planting comes to include soil preparation, drainage, irrigation, maintenance and eventual replacement. Like paving or a pipe, an urban tree should be considered throughout its life cycle. Treating shade as infrastructure means securing the conditions required for greenery to grow, endure and genuinely improve public space.

Sources

  • ArchDaily

04 · Article

Buildings designed for those who use them

Two projects with different functions and contexts demonstrate that the quality of a building also depends on the conditions it provides for those who use it.

The Green Field Factory in Rangpur, Bangladesh, received the 2026 RIBA International Prize. Designed by Nakshabid Architects for around five thousand workers, the complex combines natural ventilation and lighting, rainwater harvesting, courtyards and gardens with a nursery, clinic, canteen and community spaces.

The factory retains its industrial function, but the brief considers other needs associated with daily work. The quality of the design does not result solely from the presence of these facilities. It depends on how climate, circulation, scale and the different uses have been coordinated. Natural ventilation, for example, requires decisions concerning orientation, spatial depth, heat gains and safety.

In Ghent, the renovation of the Design Museum brings together restoration of the building, a new circulation route and a low-carbon timber wing. The project includes bricks made from municipal waste and seeks to strengthen the museum's role as a meeting place. In this case, construction choices, the operation of the facility and its relationship with the city were treated as parts of the same brief.

The two projects have very different scales, geographical settings and management models. They do not constitute a formula applicable to every building, but they demonstrate a significant change in how architecture is assessed. In addition to fulfilling its primary function, a building should respond to the climate, reduce resource consumption, facilitate wayfinding and provide appropriate conditions for its users.

This perspective is also relevant to housing and public works. A well-proportioned entrance hall, a gallery, a shared balcony or a shaded route may appear to be secondary spaces when the budget is organised solely by areas and functions. In daily use, however, these spaces influence interaction, safety, wayfinding and the way the building is appropriated.

Collective space need not be excessive, but its location, proportions and maintenance must be compatible with its intended use. These decisions should be incorporated into the brief and design from the outset. Adding facilities or environmental solutions at the end rarely corrects an organisation that has ignored the climate, separated users or wasted resources.

Designing beyond the primary function does not mean indiscriminately increasing floor area or cost. It means understanding who uses the building, for how long, under what conditions and with what support needs. This information enables more rigorous decisions and the creation of spaces that continue to work well after construction has been completed.